Skip to content
Kalin fitting a ceiling LED panel beside an illuminated exit sign in a clinic corridor

Commercial compliance

Exit and emergency light testing

The six-monthly discharge test your building needs. We're licensed electricians, so we test the fittings and fix what fails on the same visit.

  • Tested and repaired on the one visit
  • Licensed & insured
  • Six-monthly testing to AS/NZS 2293
  • Logbook kept up to date

What exit and emergency light testing involves

Twice a year, every exit sign and emergency light has to be tested, repaired if it fails, and written into the logbook.

That comes from AS/NZS 2293, the standard exit signs and emergency lights are installed and maintained to. Its maintenance side sets the routine service at every six months.

The core of it is the discharge test. The fittings come off mains power and have to run on their own batteries for the rated duration, which for most installations is 90 minutes. A fitting that goes dark before the time is up has failed.

The responsibility sits with the building owner, not the installer. In NSW, exit signs and emergency lighting are usually listed as fire safety measures on a building's annual fire safety statement, and it's the owner who has to keep each measure maintained.

What our emergency light testing covers

  1. Check every fitting

    We walk the whole building and find every exit sign and emergency light, including the ones in plant rooms and back corridors that get missed because nobody goes in there.

  2. Run the discharge test

    The fittings come off mains and run on battery for the rated duration. Anything that fails to hold up gets noted on the spot.

  3. Fix what failed

    A dead battery, a failed lamp or a faulty fitting gets replaced while we're there. We're licensed electricians, so the repair happens on the same visit as the test instead of turning into a second appointment.

  4. Update the logbook

    Results go in the record with the date, the fittings and what was done, so when somebody asks for evidence you can hand it over instead of hunting for it.

Not sure when yours was last tested?

If nobody can find the logbook, it's overdue. Call 0412 424 596 and we'll come and look at what you've got, then put it on a six-monthly schedule so it stops being your problem to remember.

What we check on every fitting

Every exit sign and emergency light on the site gets checked, run flat on its own battery and written up, and anything that fails gets dealt with on the day.

Item What we test What counts as a fail What we do about it
Exit sign That it's lit, clean and readable from the escape route Dark, dim, or blocked from view Replace the lamp or the fitting, and flag anything stacked in front of it
Emergency light That it switches over the moment the mains supply goes off Does not come on at all Replace the lamp, the driver or the whole fitting
Battery The discharge test: running on battery for the rated duration Goes dark before the time is up New battery, then test it again
Charging circuit That the fitting is charging and the indicator is lit No charge showing, or a battery that never recovers Repair the circuit or replace the fitting
Coverage That the exits, corridors, stairwells and plant rooms are covered A stretch of the way out with no emergency light on it Tell you what's missing and quote the extra fittings
Logbook That a record exists and is current No record, or nothing written in it since the last service Start it or bring it up to date on the day

Every result goes in the logbook with the date, the fitting and what was done, so you can produce the record when it's asked for.

Installation, repairs and the rest of it

Testing is usually how the relationship starts. Most buildings need a bit of work on the system itself as well.

  • New exit and emergency lighting Installation for a new fit-out or an extension, wired and positioned so the escape route is actually lit.
  • Replacing failed fittings Batteries, lamps and whole fittings replaced, including the old units that fail every test and cost more to keep patching.
  • Strata and common property Stairwells, corridors, carparks and lobbies, on the strata manager's instruction and invoiced back to them.
  • Anything else the test turns up A dead circuit or a board problem behind a failed fitting gets sorted properly rather than noted and left for someone else.

Exit and emergency lighting questions

Ask us yours on 0412 424 596

Every six months. That's the routine service interval under AS/NZS 2293, and it applies whether or not anything has gone wrong since the last one. If nobody can find a record of the last one, treat it as overdue.

Get in touch

Talk to the electrician who does the work

Call us and you get us, not a call centre. If it's urgent, ring straight through, day or night. Otherwise send a quote request and we'll come back to you with a fixed price.

  • 5.0 stars from 124 Google reviews
  • 10+ years in the trade
  • 24/7 emergency service
  • Lifetime workmanship guarantee